No ventilation facilities were installed in the eye heating area. It violated the ICTI code. |
We did not fully understand it. |
Ventilation facilities were installed in the eye heating area.
Completion date:27 May 08 |
We will regularly maintain and clean the ventilation system.
Completion date:27 May 08 |
9.12 |
2 air compressors and 2 compressor vessels were used in the factory and the capacity of air compressors was larger than 1 M3. But the factory did not provide vessel body, pressure gauge and safety valve inspection report. It violated the ICTI code. |
We did not know that it should be assessed annually by the professionals of the government. |
We have contacted the related governmental institute to assess the machines annually and will get the inspection certificate in Sep.
Completion date: 15 Sep 2008 |
We will check the record regularly and ensure that they are inspected timely.
Completion date: 15 Sep 2008 |
9.13 |
No allowable floor loading weight was determined and posted on every floor. It violated the ICTI code. |
We ignored the requirement. |
We have determined the allowable floor loading weights according to the original design drawings and then posted it on every floor..
Completion date:5 Jun 08 |
We will check and adhere to the allowable floor loading weights.
Completion date:5 Jun 08 |